手机在线一区二区三区-首页 动漫 亚洲 欧美 日韩-爽妇网国产精品-爽爽影院色黄网站在线观看-黄色网页免费观看-黄色网页在线

Sales Hotline

+86-13812297748

Stone mechanical assembly process need to pay attention to m

Machinery and equipment manufacturing enterprises to ensure the quality of stone machinery products, assembly, must be in accordance with the provisions of a variety of stone machinery product assembly technical requirements to operate. According to the common assembly of several types of mechanical equipment, we summarized the following precautions.

1, do a good job cleaning and cleaning parts. Cleaning operations include removal of residual cast sand, rust, chips and so on. In particular, some important parts, such as gantry cutting machine, cavity should be coated with anti-rust paint. Parts of the oil, rust or attached chips can be diesel, kerosene or gasoline as a washing liquid for cleaning, and then dry with compressed air.

2, match the surface in the match or before the connection, generally need to add lubricant. Especially in the spindle part of the bearing parts, lifting mechanism of the screw nut parts.

3, matching parts with the size to be accurate, the assembly should be with the size of the re-examination or sampling. For example: the shaft of the journal and bearing with the site, the spindle box and the bearing with the hole and its center distance.

4, the wheels of the assembly, requiring two-axis wheel axis must be in the same plane, and parallel to each other, should ensure that there is a normal tooth gap, while axial dislocation ≤ 2MM.

5, the joint surface should be checked whether the formation of flat, with or without deformation, or should be trimmed to remove the burr, to ensure that the contact surface close contact, flat, not skew.

6, the seal should be parallel into the sealing groove, can not twist deformation, damage scratching the sealing surface.

7, the pulley assembly requirements are two pulley shaft must be parallel, the center of the groove should be positive, offset over the General Assembly so that the pulley tension is uneven, resulting in belt slip and accelerated wear. Simultaneous V-belt assembly should be fitted before the length should be consistent, to prevent vibration in the drive.

8, before the assembly of the bearing should be cleaned, remove the anti-rust paint before assembly; cleaning should pay attention to check the raceway and rolling body with or without corrosion, rotation is flexible; bearing assembly should be coated with a layer of lubricating oil, When the pressure is not too much difference, should stop the assembly to check; bearing assembly, no model of the end should be in the direction, by the shoulder direction; set bearing when the force of the size, direction, location should be appropriate, Rolling force, should be symmetrical beating, not slam, to ensure that the end of the vertical axis and to prevent the installation of tilt.

9, threaded connection should be used to prevent the device, according to the actual situation and design requirements of the following commonly used anti-loose device: double nuts loose; spring washers loose; open pin anti-loose; stop washers loose round nuts and flower mat , Symmetrical multiple bolt tightening method should be used to gradually tighten the order of symmetry, the bar connector should be symmetrical from the middle to the two sides gradually tightened. The tail of the ribs to be bolted should protrude the nut.

10, do side inspection side inspection.

11, do a good job driving the pre-check work. For example, check the completeness of the assembly work, the accuracy and reliability of each connection, the flexibility of the movement of the movement, the normalness of the lubrication system, and so on.

12, do a good job in the start of the monitoring process. After the machine starts, should immediately observe the main working parameters and whether the normal movement of sports parts. The main operating parameters include the speed of movement, the smoothness of the movement, the spindle rotation, lubricating oil pressure and, temperature, vibration and noise. Only when the start of the campaign indicators of normal, stable, can try to run.

13, according to a variety of stone mechanical products acceptance conditions for trial operation, testing the relevant projects. For example: the knife speed and stroke adjustment and testing, lift movement stroke adjustment, spindle rotation accuracy test.

Quality stone machinery, is to process a higher quality products to ensure.
主站蜘蛛池模板: 精品国产午夜久久久久九九 | 亚欧乱色一区二区三区 | julia一区二区三区中文字幕 | 久久精品亚洲欧美日韩久久 | 国产成人片 | 欧美一级视屏 | 91精品成人福利在线播放 | 一区二区三区欧美日韩国产 | 黄色网址网站在线观看 | freesexmovies性医生| 一本大道香蕉久在线不卡视频 | 精品国产综合区久久久久久 | 日本aa视频| 欧美14videosex性欧美成人 | 国产a久久精品一区二区三区 | 另类天堂网 | 一二三四观看在线视频中文 | 国产日韩一区二区三区在线观看 | 久久久久免费精品国产 | 亚洲免费a | 午夜私人福利影院 | 精品国产一区二区三区久久 | 亚洲爱爱久久精品 | 国产成人精品午夜二三区 | 成人99国产精品一级毛片 | 午夜五月天 | 国产日产高清欧美一区二区三区 | 日本护士xxxxxx.| 午夜在线视频国产极品片 | h网站免费观看 | 欧美成人午夜片一一在线观看 | 免费区欧美一级毛片 | 中文字幕日本在线视频二区 | 国产午夜不卡在线观看视频666 | 亚洲精品日韩中文字幕久久久 | 欧美一区二区三区在观看 | 欧美三级午夜理伦三级小说 | 亚州1区2区3区4区产品乱码2021 | 日韩欧美亚洲国产精品字幕久久久 | 日本一级毛片免费 | 国产精品外围在线观看 |